Atal Tunnel (Rohtang)

3,100 m portal · Himachal — Manali → Lahaul

All year

The tunnel itself runs all year; the old Rohtang Pass road above it is roughly May–November. Lahaul's side roads and the passes beyond (Kunzum, Baralacha) open later and close earlier.

Routes: Lahaul & Sissu · Leh via Kinnaur & Spiti

Kunzum La

4,590 m · Himachal — Spiti ↔ Lahaul

Jun–Oct

The link between Kaza and Batal/Gramphu. Rough dirt with glacial-melt water crossings that rise through the day — cross in the morning.

Routes: Spiti Valley Circuit · Leh via Kinnaur & Spiti · Spiti's High Villages · Pin Valley & Mud

Sach Pass

4,420 m · Himachal — Chamba → Pangi

Jul–Sep

One of the shortest windows on the list — reliably open only mid-July to mid-September, and it shuts for days after any fresh snow. Unpaved throughout.

Routes: Pangi Valley

Chanshal Pass

4,520 m · Himachal — Rohru → Dodra Kwar

Jun–Oct

Part-unpaved, snow-patched into early summer. The Dodra Kwar pass road on the far side has a similar window.

Routes: Chanshal Pass · Dodra Kwar

Jalori Pass

3,120 m · Himachal — Aut → Jibhi/Ani

Apr–Dec · often longer

Usually open most of the year, but snow closes it for spells from roughly December to March. Steep, narrow, no barriers — avoid it wet or icy.

Routes: Jalori Pass & Jibhi

Padri Pass

3,400 m · Jammu — Bhaderwah → Chamba

May–Oct

Part-sealed, part rough. Weather turns fast up here; the Batote–Doda highway on the approach is separately landslide-prone in the monsoon.

Routes: Bhaderwah & Padri Pass

Baralacha La

4,890 m · Leh-Manali highway

Jun–Oct

First of the big Leh-Manali passes north of Jispa. Sarchu just beyond is a very high, cold place to sleep — push to Pang or drop back to Jispa if you can.

Routes: Leh via Kinnaur & Spiti

Nakee La & Lachulung La

4,740 m / 5,060 m · Leh-Manali highway

Jun–Oct

The pair after the Gata Loops. Washboard, sand and long empty stretches; Pang has the last dhaba tents before the More Plains.

Routes: Leh via Kinnaur & Spiti

Tanglang La

5,328 m · Leh-Manali highway

Jun–Oct

The highest point on the Delhi–Leh spine, the last pass before the Indus valley and Leh. Do not linger at the top.

Routes: Leh via Kinnaur & Spiti

Khardung La

5,360 m · Ladakh — Leh → Nubra

Jun–Sep · often longer

Paved but rough and slushy in patches, with heavy traffic. Often cleared and open beyond this window, but treat June–September as the safe planning band. Ladakh permit fees (paid online) apply for Nubra; carry the receipt and a photo ID.

Routes: Turtuk & the Nubra-Shyok Villages

Chumathang / Nyoma road to Hanle

up to 4,500 m · Ladakh — Changthang

Jun–Sep

Long stretches of new blacktop now, but rough graded sections and stream crossings remain, all at 4,000–4,500 m. Bitter wind; Ladakh permit fees (paid online) apply — carry the receipt and a photo ID.

Routes: Hanle & the Changthang

Dharchula → Gunji / Adi Kailash road

up to 4,570 m · Uttarakhand — Byans valley

Jun–Sep

The Malpa and Budhi sections are steep and notoriously slide-prone; the top is loose rock at over 4,000 m. Inner Line Permit and a medical check needed.

Routes: Adi Kailash & Om Parvat

Dharchula → Darma valley road

up to 3,500 m at the villages · Uttarakhand — Darma valley

Jun–Sep

Rough BRO track beyond Dar with water crossings and slide zones. The Kali-river approach itself slides in the monsoon. Inner Line Permit required.

Routes: Darma Valley

Spiti high-village roads (Komic, Hikkim, Demul)

up to 4,590 m · Himachal — Spiti plateau

Jun–Sep

The Langza–Komic–Hikkim loop and the Demul climb open late — often not until late June — and shut after any snow.

Routes: Spiti's High Villages

Chandratal link road (Batal side)

4,300 m lake · Himachal — Spiti/Lahaul

Jun–Oct

Rough track with water crossings off the Kunzum road. Camping is now restricted to the designated ground away from the lake.

Routes: Spiti Valley Circuit

A pass being "open" is not the same as it being safe on the day. A single storm shuts any of these for days, glacial-melt crossings are lowest in the early morning, and the approach roads (the Sutlej gorge, the Mandi–Manali road, NH-244 to Doda) slide independently of the pass. Ride passes and crossings in the dry morning, carry spare days and fuel, and never push a closing window.